Simulation of productive processes using Lego® blocks for application of the concepts of integrated production management

Authors

  • Gustavo Lopes Olivares UFRRJ
  • Eduardo de Oliveira Ormond
  • Raphaela Pereira Rangel

DOI:

https://doi.org/10.14488/BJOPM.2020.036

Keywords:

Methodology, Experiential learning, Industrial simulation, Production management, Integration of processes

Abstract

Goal: This article describes a simulation exercise based on the premises of the experiential learning approach, using Lego® blocks to build a production plant model. Design / Methodology / Approach: The simulation was applied to groups of 4 to 6 participants, enrolled in production management or similar classes. Results: The use of this approach promoted a learning environment with greater interaction and stimulated the students to put their reasoning, decision-making and communication skills into practice. Limitations of the investigation: Because the simulation is only a representation of reality, it can generate some generalization, and since it is a controlled experiment, all the variables are known in advance. Therefore, the practices using the simulation should be discussed and contrasted with real-world practices after application of the method. Practical implications: This simulation enables examining themes such as inventories, supply chains, production planning and scheduling, layout, MRP, and mainly integration of organizational processes in practice, promoting hands-on experience. Originality / Value: The reports of the participants indicated a positive impact of the proposed simulation, by stimulating the development of skills and capabilities for their training as future managers.

Downloads

Download data is not yet available.

Author Biographies

Eduardo de Oliveira Ormond

Mestrado Profissional em Gestão e Estratégia - UFRRJ

Raphaela Pereira Rangel

Mestrado Acadêmico em Administração - UFRRJ

Downloads

Published

2020-09-29

How to Cite

Olivares, G. L., Ormond, E. de O., & Rangel, R. P. (2020). Simulation of productive processes using Lego® blocks for application of the concepts of integrated production management. Brazilian Journal of Operations & Production Management, 17(3), 1–11. https://doi.org/10.14488/BJOPM.2020.036