1.
Lemes Leite Barbosa G, Cooper OrdoƱez RE, Anholon R, Sanchez MA. A manufacturing bottleneck case study trough the theory of constraints and computational simulation of the proposed bottleneck solution. BJO&PM [Internet]. 2018 Jan. 26 [cited 2024 Nov. 24];15(1):54-67. Available from: https://bjopm.org.br/bjopm/article/view/399