[1]
I. L. Goettems, R. G. de F. Correa, J. L. Schaefer, F. A. P. Peres, and I. C. Baierle, “Analysis of the product development process to reduce lead time in the engineering sector of a metal-mechanical industry”, BJO&PM, vol. 22, no. 3, p. 2610 , Sep. 2025.