[1]
M. F. Mello and G. M. Fassini, “APPLICATION OF THE TOOLS OF PRODUCTION ENGINEERING FOR THE REDUCTION OF DEAD TIME IN AN ASSEMBLY LINE”, BJO&PM, vol. 14, no. 1, pp. 2–8, May 2017.