GOETTEMS, I. L.; CORREA, R. G. de F.; SCHAEFER, J. L.; PERES, F. A. P.; BAIERLE, I. C. Analysis of the product development process to reduce lead time in the engineering sector of a metal-mechanical industry. Brazilian Journal of Operations & Production Management, [S. l.], v. 22, n. 3, p. 2610 , 2025. DOI: 10.14488/BJOPM.2610.2025. Disponível em: https://bjopm.org.br/bjopm/article/view/2610. Acesso em: 28 sep. 2025.