Fontana, M. E., Nepomuceno, V. S., & Garcez, T. V. (2020). A hybrid approach development to solving the storage location assignment problem in a picker-to-parts system. Brazilian Journal of Operations & Production Management, 17(1), 1–14. https://doi.org/10.14488/BJOPM.2020.005