Mello, M. F., & Fassini, G. M. (2017). APPLICATION OF THE TOOLS OF PRODUCTION ENGINEERING FOR THE REDUCTION OF DEAD TIME IN AN ASSEMBLY LINE. Brazilian Journal of Operations & Production Management, 14(1), 2–8. https://doi.org/10.14488/BJOPM.2017.v14.n1.a1