[1]
Mello, M.F. and Fassini, G.M. 2017. APPLICATION OF THE TOOLS OF PRODUCTION ENGINEERING FOR THE REDUCTION OF DEAD TIME IN AN ASSEMBLY LINE. Brazilian Journal of Operations & Production Management. 14, 1 (May 2017), 2–8. DOI:https://doi.org/10.14488/BJOPM.2017.v14.n1.a1.